Team overruns · choose plan

Why ask this?

A project lead wants to find where individual tasks overran their hours even when other tasks finished early. Counting positive overruns keeps those tasks visible.

Start with the sample data

Open source.csv. In the first row of source.csv, Team = East, Task = A, Original planned hours = 4, Revised planned hours = 5, Used hours = 6.

What to say

Create a bar chart of total overrun by team. Subtract planned hours from used hours for each task, keep only positive overruns, then sum them by team.

Processing time

Recorded audio to chart ready
7.16 s
Transcript to chart ready
0.51 ms

One local replay from recorded audio through transcription and native chart data preparation. Includes processing of the clarification and reply. Time waiting for a person to answer is excluded. Recording time and screen painting are excluded.

See the transcript in the composerRecorded transcript entered in the native composer
What n0is transcribed

Create a bar chart of total overrun by team. Subtract planned hours from used hours for each task. Keep only positive overruns. Then sum them by team.

When n0is asks

Which baseline should I subtract?

Revised planned hours.

How the canvas produces the result

  1. CSV Input · Read the sample records

    source.csv supplies 3 rows. These records are the inputs to the next step.

  2. Math · Calculate Overrun

    Apply [Used hours] - ([Revised planned hours]) to each input row. The first row yields 1.

  3. Measure Filter · Keep the requested rows

    The filter uses Overrun > 0 in keep mode. 2 rows remain including East.

  4. Aggregate · Sum Overrun for each Team

    If a category appears more than once, its records contribute to one result. The first output row contains Team = East, sum_Overrun = 1.

  5. Column Renamer · Prepare the output columns

    sum_Overrun becomes Total overrun. The result exposes Team, Total overrun.

  6. Charts · Draw the bar chart

    Use Team for the categories and Total overrun for the plotted values.

Canvas review in progress for Math. The recording verifies the result. Rebuilding these steps from the left panel still needs verification.

Native n0is canvas for Team overruns · choose plan

The chart

Workflow result in n0is
TeamTotal overrun
East1
West3

How to use the result

For Team East, the sample reports Total overrun of 1.

Synthetic test audio. Screenshots from the recorded workflow in n0is.