Busiest routes
Why ask this?
Before assigning extra loading capacity, a dispatcher wants a short list of the routes carrying the highest combined volume.
Start with the sample data
Open source.csv. In the first row of source.csv, Route = East, Cartons = 9.
What to say
Please show the two busiest routes by total cartons as a bar chart, busiest first.
Processing time
- Recorded audio to chart ready
- 3.17 s
- Transcript to chart ready
- 0.45 ms
One local replay from recorded audio through transcription and native chart data preparation. The current replay produced the same chart type and values with signed-axis support enabled since the screenshot was captured. Recording time and screen painting are excluded.
See the transcript in the composer

What n0is transcribed
Please show the two busiest routes by total cartons as a bar chart. Busiest first.
How the canvas produces the result
- CSV Input · Read the sample records
source.csv supplies 5 rows. These records are the inputs to the next step.
- Aggregate · Sum Cartons for each Route
If a category appears more than once, its records contribute to one result. The first output row contains Route = East, sum_Cartons = 11.
- Sort · Order the results
Sort by sum_Cartons (descending), then Route (ascending). The first rows in order are West → East → South.
- Rank · Assign a rank
The ordered rows receive positions starting at 1. Here, West is #1, East is #2, South is #3.
- Measure Filter · Keep the requested rows
The filter uses rank <= 2 in keep mode. 2 rows remain including West.
- Column Renamer · Prepare the output columns
Remove rank. The result exposes Route, sum_Cartons.
- Charts · Draw the bar chart
Use Route for the categories and sum_Cartons for the plotted values.

The chart

| Route | sum_Cartons |
|---|---|
| West | 12 |
| East | 11 |
How to use the result
For Route West, the sample reports total Cartons of 12.
Synthetic test audio. Screenshots from the recorded workflow in n0is.