Plant power overruns

Why ask this?

A facilities lead wants to identify plants that exceeded planned power usage and check the size of each overrun.

Start with the sample data

Open source.csv. In the first row of source.csv, Plant = Hot, Planned watts = 5, Used watts = 7.

What to say

List only the plants that used more watts than planned. Subtract planned watts from used watts and show the overrun.

Processing time

Recorded audio to table ready
4.55 s
Transcript to table ready
0.35 ms

One local replay from recorded audio through transcription and native table data preparation. Recording time and screen painting are excluded.

See the transcript in the composerRecorded transcript entered in the native composer
What n0is transcribed

List only the plants that use more watts than planned. Subtract planned watts from used watts and show the overrun.

How the canvas produces the result

  1. CSV Input · Read the sample records

    source.csv supplies 2 rows. These records are the inputs to the next step.

  2. Math · Calculate Overrun

    Apply [Used watts] - ([Planned watts]) to each input row. The first row yields 2.

  3. Measure Filter · Keep the requested rows

    The filter uses Overrun > 0 in keep mode. 1 rows remain including Hot.

  4. Wild Headers · Choose the output columns

    Use keep mode with the regular expression ^(Plant|Overrun)$. The output contains Plant, Overrun.

Native n0is canvas for Plant power overruns

The result table

Workflow result in n0is
PlantOverrun
Hot2

How to use the result

For Plant Hot, the sample reports Overrun of 2.

Synthetic test audio. Screenshots from the recorded workflow in n0is.