Plant power overruns
Why ask this?
A facilities lead wants to identify plants that exceeded planned power usage and check the size of each overrun.
Start with the sample data
Open source.csv. In the first row of source.csv, Plant = Hot, Planned watts = 5, Used watts = 7.
What to say
List only the plants that used more watts than planned. Subtract planned watts from used watts and show the overrun.
Processing time
- Recorded audio to table ready
- 4.55 s
- Transcript to table ready
- 0.35 ms
One local replay from recorded audio through transcription and native table data preparation. Recording time and screen painting are excluded.
See the transcript in the composer

What n0is transcribed
List only the plants that use more watts than planned. Subtract planned watts from used watts and show the overrun.
How the canvas produces the result
- CSV Input · Read the sample records
source.csv supplies 2 rows. These records are the inputs to the next step.
- Math · Calculate Overrun
Apply [Used watts] - ([Planned watts]) to each input row. The first row yields 2.
- Measure Filter · Keep the requested rows
The filter uses Overrun > 0 in keep mode. 1 rows remain including Hot.
- Wild Headers · Choose the output columns
Use keep mode with the regular expression ^(Plant|Overrun)$. The output contains Plant, Overrun.

The result table

| Plant | Overrun |
|---|---|
| Hot | 2 |
How to use the result
For Plant Hot, the sample reports Overrun of 2.
Synthetic test audio. Screenshots from the recorded workflow in n0is.