Budget shorthand · choose original
Why ask this?
A project controller comparing spending against a budget needs to choose the approved baseline before deciding which projects require an explanation.
Start with the sample data
Open source.csv. In the first row of source.csv, Project = P, Actual cost = 8, Original budgeted cost = 10, Revised budgeted cost = 6.
What to say
Show a bar chart of net variance by project. Add up actual cost and budgeted cost by project first, then subtract budget from actual. Keep positive, negative and zero projects.
Processing time
- Recorded audio to chart ready
- 11.17 s
- Transcript to chart ready
- 0.71 ms
One local replay from recorded audio through transcription and native chart data preparation. Includes processing of the clarification and reply. Time waiting for a person to answer is excluded. Recording time and screen painting are excluded.
See the transcript in the composer

What n0is transcribed
Show a bar chart of net variance by project. Add up actual cost and budgeted cost by project first, then subtract budget from actual. Keep positive, negative, and zero projects.
When n0is asks
Which column should I subtract?
- Original budgeted cost
- Revised budgeted cost
Original budgeted cost.
How the canvas produces the result
- CSV Input · Read the sample records
source.csv supplies 2 rows. These records are the inputs to the next step.
- Aggregate · Sum Actual cost, Sum Original budgeted cost for each Project
If a category appears more than once, its records contribute to one result. The first output row contains Project = P, sum_Actual cost = 8, sum_Original budgeted cost = 10.
- Math · Calculate Net variance
Apply [sum_Actual cost] - ([sum_Original budgeted cost]) to each input row. The first row yields -2.
- Charts · Draw the bar chart
Use Project for the categories and Net variance for the plotted values.
Canvas review in progress for Math. The recording verifies the result. Rebuilding these steps from the left panel still needs verification.

The chart

| Project | Net variance |
|---|---|
| P | -2 |
| Q | 3 |
How to use the result
For Project P, the sample reports Net variance of -2.
Synthetic test audio. Screenshots from the recorded workflow in n0is.