Which observed month should stand in for missing March?
Why ask this?
A supervisor preparing a March review finds that the service log skips from February to April. The choice of comparison month changes the reported growth. The source supports February or April.
Start with the sample data
Open source.csv. In the first row of source.csv, Date = 2025-01-02, Visits = 4.
What to say
Build a variance report for visits by date per month from January 2025 to March 2025 with total.
Processing time
- Recorded audio to table ready
- 6.25 s
- Transcript to table ready
- 0.82 ms
One local replay from recorded audio through transcription and native table data preparation. Includes processing of the clarification and reply. Time waiting for a person to answer is excluded. Recording time and screen painting are excluded.
See the transcript in the composer

When n0is asks
There are no observations for 2025-03. Which available period should I use?
- 1. 2025-02
- 2. 2025-04
Option two.
How the canvas produces the result
- CSV Input · Read the sample records
source.csv supplies 5 rows. These records are the inputs to the next step.
- Period comparison · Compare 2025-01 with 2025-04
The Date field assigns each record to its period. The sum of Visits is 10 in the baseline and 20 in the comparison period. The difference is 10. That is a 100% change from the baseline.
Canvas review in progress for Period comparison. The recording verifies the result. Rebuilding these steps from the left panel still needs verification.

The result table

| Baseline | Current | Change | Change % | Metric | Baseline period | Current period | Statistic |
|---|---|---|---|---|---|---|---|
| 10 | 20 | 10 | 100 | Visits | 2025-01 | 2025-04 | sum |
How to use the result
One record to review is Baseline = 10, Current = 20, Change = 10, Change % = 100, Metric = Visits. Follow the canvas steps above to trace that row back to its inputs.
Synthetic test audio. Screenshots from the recorded workflow in n0is.