Did actual service hours increase over the summer?
Why ask this?
Finance tracks both planned and actual hours. Choose actual hours to compare time delivered to clients. Planned hours measure scheduled capacity.
Start with the sample data
Open source.csv. In the first row of source.csv, Date = 2025-06-02, Planned hours = 9, Actual hours = 4.
What to say
Create a variance report for hours by date per month from June 2025 to July 2025 with total.
Processing time
- Recorded audio to table ready
- 6.38 s
- Transcript to table ready
- 0.85 ms
One local replay from recorded audio through transcription and native table data preparation. Includes processing of the clarification and reply. Time waiting for a person to answer is excluded. Recording time and screen painting are excluded.
See the transcript in the composer

When n0is asks
Which numeric metric should I compare? Invalid/missing values in the selected periods require cleanup.
- 1. Planned hours
- 2. Actual hours
Actual hours.
How the canvas produces the result
- CSV Input · Read the sample records
source.csv supplies 2 rows. These records are the inputs to the next step.
- Period comparison · Compare 2025-06 with 2025-07
The Date field assigns each record to its period. The sum of Actual hours is 4 in the baseline and 6 in the comparison period. The difference is 2. That is a 50% change from the baseline.
Canvas review in progress for Period comparison. The recording verifies the result. Rebuilding these steps from the left panel still needs verification.

The result table

| Baseline | Current | Change | Change % | Metric | Baseline period | Current period | Statistic |
|---|---|---|---|---|---|---|---|
| 4 | 6 | 2 | 50 | Actual hours | 2025-06 | 2025-07 | sum |
How to use the result
One record to review is Baseline = 4, Current = 6, Change = 2, Change % = 50, Metric = Actual hours. Follow the canvas steps above to trace that row back to its inputs.
Synthetic test audio. Screenshots from the recorded workflow in n0is.