Before a margin review, a manager wants to know how far each location sits above or below its target, measured in percentage points.
Start with the sample data
Open source.csv. In the first row of source.csv, Branch = East, Site = Oak, Station = One, Actual margin = 15, Target margin = 20.
What to say
Make a bar chart of the margin gap by branch in percentage points. Subtract target margin from actual margin for each branch.
Processing time
- Recorded audio to chart ready
- 5.71 s
- Transcript to chart ready
- 0.43 ms
One local replay from recorded audio through transcription and native chart data preparation. Includes processing of the clarification and reply. Time waiting for a person to answer is excluded. Recording time and screen painting are excluded.
See the transcript in the composer

When n0is asks
Branch repeats. Which field should label each row?
- Site
- Station
Site.
How the canvas produces the result
- CSV Input · Read the sample records
source.csv supplies 2 rows. These records are the inputs to the next step.
- Math · Calculate Margin gap (percentage points)
Apply [Actual margin] - ([Target margin]) to each input row. The first row yields -5.
- Charts · Draw the bar chart
Use Site for the categories and Margin gap (percentage points) for the plotted values.
Canvas review in progress for Math. The recording verifies the result. Rebuilding these steps from the left panel still needs verification.

The chart

| Branch | Site | Station | Margin gap (percentage points) |
|---|---|---|---|
| East | Oak | One | -5 |
| East | Pine | Two | 6 |
How to use the result
One record to review is Branch = East, Site = Oak, Station = One, Margin gap (percentage points) = -5. Follow the canvas steps above to trace that row back to its inputs.