Delivery variance by depot
Why ask this?
A dispatch lead reviewing deliveries wants to identify where actual volume exceeded or fell short of the plan before investigating the manifests.
Start with the sample data
Open source.csv. In the first row of source.csv, Depot = North, Planned boxes = 10, Delivered boxes = 14.
What to say
Make a bar chart of delivery variance by depot. Subtract planned boxes from delivered boxes for each depot.
Processing time
- Recorded audio to chart ready
- 4.25 s
- Transcript to chart ready
- 0.41 ms
One local replay from recorded audio through transcription and native chart data preparation. Recording time and screen painting are excluded.
See the transcript in the composer

How the canvas produces the result
- CSV Input · Read the sample records
source.csv supplies 2 rows. These records are the inputs to the next step.
- Math · Calculate Delivery variance
Apply [Delivered boxes] - ([Planned boxes]) to each input row. The first row yields 4.
- Charts · Draw the bar chart
Use Depot for the categories and Delivery variance for the plotted values.
Canvas review in progress for Math. The recording verifies the result. Rebuilding these steps from the left panel still needs verification.

The chart

| Depot | Delivery variance |
|---|---|
| North | 4 |
| South | -2 |
How to use the result
For Depot North, the sample reports Delivery variance of 4.
Synthetic test audio. Screenshots from the recorded workflow in n0is.