Delivery variance by depot

Why ask this?

A dispatch lead reviewing deliveries wants to identify where actual volume exceeded or fell short of the plan before investigating the manifests.

Start with the sample data

Open source.csv. In the first row of source.csv, Depot = North, Planned boxes = 10, Delivered boxes = 14.

What to say

Make a bar chart of delivery variance by depot. Subtract planned boxes from delivered boxes for each depot.

Processing time

Recorded audio to chart ready
4.25 s
Transcript to chart ready
0.41 ms

One local replay from recorded audio through transcription and native chart data preparation. Recording time and screen painting are excluded.

See the transcript in the composerRecorded transcript entered in the native composer

How the canvas produces the result

  1. CSV Input · Read the sample records

    source.csv supplies 2 rows. These records are the inputs to the next step.

  2. Math · Calculate Delivery variance

    Apply [Delivered boxes] - ([Planned boxes]) to each input row. The first row yields 4.

  3. Charts · Draw the bar chart

    Use Depot for the categories and Delivery variance for the plotted values.

Canvas review in progress for Math. The recording verifies the result. Rebuilding these steps from the left panel still needs verification.

Native n0is canvas for Delivery variance by depot

The chart

Workflow result in n0is
DepotDelivery variance
North4
South-2

How to use the result

For Depot North, the sample reports Delivery variance of 4.

Synthetic test audio. Screenshots from the recorded workflow in n0is.