Defect Pareto · tied counts
Why ask this?
A quality lead can investigate only a few defect causes this week. The bars identify frequent causes and the cumulative line shows how much of the defect count the first few causes cover.
Start with the sample data
Open source.csv. In the first row of source.csv, Reason = Seal, Defects = 4.
What to say
Build a Pareto chart of defects by reason. Show cumulative percent and put tied reasons in alphabetical order.
Processing time
- Recorded audio to chart ready
- 4.69 s
- Transcript to chart ready
- 0.60 ms
One local replay from recorded audio through transcription and native chart data preparation. Recording time and screen painting are excluded.
See the transcript in the composer

How the canvas produces the result
- CSV Input · Read the sample records
source.csv supplies 3 rows. These records are the inputs to the next step.
- Contribution report · Contribution report
The first output row contains Category = Bolt, Amount = 4, Share % = 40, Cumulative amount = 4, Cumulative share % = 40.
- Charts · Draw the pareto chart
Use Amount for the categories and Cumulative share % for the plotted values.
Canvas review in progress for Contribution report. The recording verifies the result. Rebuilding these steps from the left panel still needs verification.

The chart

| Category | Amount | Share % | Cumulative amount | Cumulative share % |
|---|---|---|---|---|
| Bolt | 4 | 40 | 4 | 40 |
| Seal | 4 | 40 | 8 | 80 |
| Cap | 2 | 20 | 10 | 100 |
How to use the result
One record to review is Category = Bolt, Amount = 4, Share % = 40, Cumulative amount = 4, Cumulative share % = 40. Follow the canvas steps above to trace that row back to its inputs.
Synthetic test audio. Screenshots from the recorded workflow in n0is.