Completion rate by clinic

Why ask this?

A clinic scheduler wants to see where scheduled appointments most often turn into completed visits before investigating missed appointments.

Start with the sample data

Open source.csv. In the first row of source.csv, Clinic = A, Completed = 1, Scheduled = 2.

What to say

Make a bar chart of completion rate by clinic. Divide total completed by total scheduled and show it as a percentage. Skip zero scheduled rows.

Processing time

Recorded audio to chart ready
5.90 s
Transcript to chart ready
0.38 ms

One local replay from recorded audio through transcription and native chart data preparation. The current replay produced the same chart type and values with signed-axis support enabled since the screenshot was captured. Recording time and screen painting are excluded.

See the transcript in the composerRecorded transcript entered in the native composer

How the canvas produces the result

  1. CSV Input · Read the sample records

    source.csv supplies 3 rows. These records are the inputs to the next step.

  2. Period comparison · 100 × Total Completed / total Scheduled by Clinic

    The first output row contains Clinic = A, Completion rate percent = 75.

  3. Charts · Draw the bar chart

    Use Clinic for the categories and Completion rate percent for the plotted values.

Canvas review in progress for Period comparison. The recording verifies the result. Rebuilding these steps from the left panel still needs verification.

Native n0is canvas for Completion rate by clinic

The chart

Workflow result in n0is
ClinicCompletion rate percent
A75
B66.67

How to use the result

For Clinic A, the sample reports Completion rate percent of 75.

Synthetic test audio. Screenshots from the recorded workflow in n0is.