Campaign budget overruns
Why ask this?
Before approving another round of campaign spend, a marketing lead wants to find campaigns already over budget and see the size of each overrun.
Start with the sample data
Open source.csv. In the first row of source.csv, Campaign = Spring, Spent dollars = 104.75, Budgeted dollars = 100.
What to say
List only the campaigns that spent more dollars than budgeted. Subtract budgeted dollars from spent dollars and show the overrun.
Processing time
- Recorded audio to table ready
- 4.82 s
- Transcript to table ready
- 0.38 ms
One local replay from recorded audio through transcription and native table data preparation. Recording time and screen painting are excluded.
See the transcript in the composer

How the canvas produces the result
- CSV Input · Read the sample records
source.csv supplies 3 rows. These records are the inputs to the next step.
- Math · Calculate Overrun
Apply [Spent dollars] - ([Budgeted dollars]) to each input row. The first row yields 4.75.
- Measure Filter · Keep the requested rows
The filter uses Overrun > 0 in keep mode. 1 rows remain including Spring.
- Wild Headers · Choose the output columns
Use keep mode with the regular expression ^(Campaign|Overrun)$. The output contains Campaign, Overrun.

The result table

| Campaign | Overrun |
|---|---|
| Spring | 4.75 |
How to use the result
For Campaign Spring, the sample reports Overrun of 4.75.
Synthetic test audio. Screenshots from the recorded workflow in n0is.